Solar panels - Installation and assembly

Solar panels - Installation and assembly

After our inquiry, we will start the design of the system with an on-site survey!

During the on-site survey, we establish the parameters and orientation of the roof,
so that the exact price offer is finally formed!
Installation

The installation process for family houses usually takes 1-2 days!
First, we install the roof hook, then the rails and then the solar panels are placed in their place!

In the meantime, the installation of the inverter is underway, which may be outdoors or indoors!
The installation must be carried out by qualified teams!

Reliable systems installed by us

Solar panel

25-year linear performance guarantee

Inverter

Adapted to technical conditions

Battery

Adapted to technical conditions

Our reference works